Work package 4.7 and deliverables

The results of WP4.3, WP4.4, WP4.5 and WP4.6 will be integrated in a dynamic validation platform that will be made available to the project.

Deliverable :

  • A4.D7.1 - Integrated Dynamic Validation Prototype (2009)